Search
News
View full story 13bfatravel-scholarships.jpg

story

May 16, 2013

Scholarships Fund CIA Grads' Travel Dreams

View details Biomedical Art Exhibition

events

May 03, 2013 @ Arts Collinwood in Cleveland, OH

Biomedical Art Exhibition

View full story cia1jpg-afa505e4b70c97b6.jpg

story

May 16, 2013

Plain Dealer Reports on the Groundbreaking of the New Gund Building

View details 2013 Student Summer Show

cia exhibition

May 20, 2013

2013 Student Summer Show

View on Facebook

social

about 15 hours ago via Facebook

Class of 2013! See what your fellow alumni are up to and join the conversation in our Alumni Facebook group: http://ow.ly/lfg8B.

View full story olaughlin.jpg

story

May 09, 2013

Four High School Students Awarded in CIA's National 2D3D Art + Design Contest

View details

events

May 31, 2013

Cinematheque to Present Two Parallel Comedy Film Series

View full story moca-collaboration3.jpg

story

May 02, 2013

Performance Art at MOCA Cleveland

View details lore.jpg

blog

May 21, 2013

5/21-25: Lore, Leviathan, Ozu & more!

View full story ipadsstudents.jpg

story

May 02, 2013

CIA's iPad Curriculum Turns Two

News . Feature Stories . Campus Project Update ? July '09

News

July 24, 2009

Campus Project Update ? July '09

Construction crews spent June and July 2009 renovating major parts of the McCullough Center, especially its heating and cooling systems.

Campus Project Update ? July '09

It’s been a busy summer at the Institute’s Joseph McCullough Center for the Visual Arts, where considerable progress has already been made on our enormously important campus modernization and unification project. Construction crews are renovating the McCullough building, which was originally built in 1914 as a Model T Ford assembly plant. That facility, which the Institute has now owned for a quarter of a century, will serve as the core of the new, unified campus. But first it needs to undergo major repairs and updating, particularly to make its heating and cooling systems more effective and energy efficient and to better utilize existing space within the building.

Toward those ends, over the last two months:

• Air handling units have been installed on all four floors

• Three 200-ton capacity centrifugal chillers have been moved into place

• A cooling tower has been placed on the roof

• Four hot water heating boilers have been moved into place to keep the building warm during the winter months

• Three domestic hot water heating boilers have been installed to supply the building’s hot water

• Installation of duct work has been initiated; in some areas, temporary duct work will be used to assure cooling until permanent duct work can be put in place

• The east and north sides of the building have been power washed to help refresh the appearance of the historic building

• Masonry repairs on the east and north sides of the building are well underway, which will safeguard against the infiltration of water into the building and prevent the recurrence of leaks

• Multiple layers of existing roofing have been removed and a new rubber membrane has been installed, held down by heavy river-bed stone, to prevent leakage from the roof

• The third floor has been extended out over the Sculpture area (which used to be two floors high), thus creating nearly 5,500 square feet of new space that will be used for instructional and studio purposes as well as for installation projects (shown in picture)

• The large first floor space, formerly leased to the Social Security Administration, is being transformed into six academic classrooms and a new home for the Academic Writing Center

—Courtesy of David Deming, President of The Cleveland Institute of Art

Read more campus project updates.

YouTube Facebook Twitter LinkedIn Flickr

Social Feed

Congratulations to all of the CIA students who will be graduating tomorrow! http://t.co/q5zegJCkIl

4 days ago via Twitter

Sign up for our alumni + friends newsletter

Arrow

Questions?

For more information about this or other CIA news, contact us here.

Read More

Cores + Connections

Learn more about CIA's proven method for academic and professional excellence.

Read More

Pre-College Program

Sharpen your artistic skills at CIA's Pre-College Program this summer.

Read More

Deposit Today to Reserve Your Space this Fall

Freshmen are encouraged to deposit as soon as possible!